Sludge dewatering machine The use effect of is affected by many factors. In order to ensure the best treatment effect and high efficiency, the following are some important considerations:
1. Control the treatment capacity of the sludge dehydrator within an appropriate range, and adjust it in combination with sludge flow, flocculant flow and differential speed to avoid equipment overload and frequent fluctuations caused by sudden load increase, which will affect the treatment effect. At the same time, it is necessary to achieve greater equipment processing efficiency.
2. Adjust the flow and differential speed of flocculant in time to adapt to the change of sludge concentration, and ensure the treatment effect and avoid waste. When the sludge flow or sludge concentration increases, the flocculant flow and differential velocity shall be increased accordingly. When the sludge flow or sludge concentration decreases, the flocculant flow and differential velocity shall be reduced accordingly.
3. The selection of flocculant shall consider the match of reagent quality and sludge property, as well as the match of equipment structure type and operating conditions. Only by finding the best operation combination, can the lowest consumption of flocculant, the best treatment effect and the highest treatment efficiency be achieved.
4. Determine the optimal differential speed value range by combining torque data Centrifuge Under the condition of blocking and meeting the treatment capacity, try to use a lower differential speed to achieve better treatment effect and save flocculant consumption.
5. The work of on-site management and operators is to constantly observe, timely adjust and summarize experience. In various possible changes, seek the best and relatively stable cooperation of operating parameters. It is recommended to observe and adjust the equipment every 1 to 2 hours to avoid not making any adjustment for a long time. Operators should have a positive attitude and sense of responsibility to avoid problems such as low efficiency of long-term operation of sludge dewatering workshop, large fluctuation of treatment effect and waste of chemicals.
6. The dehydration effect of the dehydrator shall be checked frequently. If the separation liquid or filtrate is found to be turbid and the solid recovery rate drops, the causes shall be analyzed in time and corresponding solutions shall be taken.
7. Regularly observe the sludge dewatering effect. If the solid content of sludge cake decreases, analyze and take corresponding measures.
8. Frequently observe the operation condition of the sludge dewatering unit, and take corrective measures in time to ensure the normal operation of the equipment for abnormal phenomena.
9. Ensure that the dehydrator has enough washing time every day. When the dehydrator is shut down, the interior and surrounding of the machine should be thoroughly cleaned to reduce odor. Otherwise, it will be very difficult to clean the dry sludge after it accumulates.
10. Observe, check and maintain the dehydrator frequently according to the requirements of the dehydrator.
11. Always pay attention to the wear of the dehydrator, and replace it if necessary.
12. Timely find out the damage of the filter belt caused by sand particles in the sludge of the dehydrator, and replace the filter belt in time when the damage is serious.
13. Make analysis and measurement records to analyze and track the operation and effect of the dehydrator.
The above are some precautions about the sludge dehydrator. I hope they can help you.

Zhejiang Zhengda Environmental Protection Equipment Co., Ltd.: focusing on Horizontal spiral sedimentation centrifuge, sludge dewatering machine, sludge treatment equipment, centrifugal dewatering machine, sludge dewatering equipment, solid-liquid separation equipment, horizontal spiral centrifuge, centrifuge, mud dewatering machine, mud dewatering equipment, mud treatment equipment, horizontal centrifuge, solid-liquid separator Production, sales and service of various solid-liquid separation equipment. Welcome new and old customers to come for consultation and investigation.
Factory address: No. 812, Jiulong Street, Bihu Town Industrial Zone, Liandu District, Lishui City, Zhejiang Province Telephone: 0578-2788008 Fax :0578-2788681
Email: [email protected] website: //hcsxe.com
Mobile: 15857812218 (Mr. Mao) fifteen billion two hundred and fifty-seven million eight hundred and twenty-six thousand six hundred and nine (Manager Xu) thirteen billion nine hundred and six million seven hundred and eighty-eight thousand three hundred and sixty-seven (Mr. Xu)